← All projects

Deck Build

Central Washington

Two decks and a French door on one job. The framing gets squared and levelled before a single board goes down, which is the part nobody sees and the part that decides how the deck feels in ten years.

This job is part of what we take on as deck building and repair.

The finished deck with full width steps
Deck framing squared and levelled before any boards went down
Framing Finished

In progress

After

Ready to get it done?

Tell us about the project, or call and talk it through.